Southeast Queue Project 35 — Solar+Battery in an unlisted county, Florida

Southeast Queue Project 35 — Solar+Battery in an unlisted county, Florida is a 24.4 MW solar+battery interconnection project with a current status of withdrawn. It is proposed to connect at SGS Switchyard.

24.4 MWCapacity
WithdrawnStatus
SoutheastMarket
Solar+BatteryTechnology

Project facts

Canonical nameSoutheast Queue Project 35 — Solar+Battery in an unlisted county, Florida
Queue ID35
Statuswithdrawn
Source statuswithdrawn
MarketSoutheast
TechnologySolar+Battery
Capacity24.4 MW
StateFlorida
County
Point of interconnectionSGS Switchyard
Requested (queue) date2023-12-01
Proposed in-service date2028-06-01
Operational date
Withdrawn date
Developer
Utility / transmission ownerSeminole Electric Cooperative

What changed

No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-27

Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.