Southeast Queue Project 353 — Solar in Fayette, Tennessee

Southeast Queue Project 353 — Solar in Fayette, Tennessee is a 340.0 MW solar interconnection project in Fayette, Tennessee with a current status of withdrawn.

340.0 MWCapacity
WithdrawnStatus
SoutheastMarket
SolarTechnology

Project facts

Canonical nameSoutheast Queue Project 353 — Solar in Fayette, Tennessee
Queue ID353
Statuswithdrawn
Source statuswithdrawn
MarketSoutheast
TechnologySolar
Capacity340.0 MW
StateTennessee
CountyFayette
Point of interconnection
Requested (queue) date2018-06-05
Proposed in-service date
Operational date
Withdrawn date
Developer
Utility / transmission ownerTennessee Valley Authority

What changed

No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-27

Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata