Southeast Queue Project 369B — Gas in Escambia, Florida

Southeast Queue Project 369B — Gas in Escambia, Florida is a 960.0 MW gas interconnection project in Escambia, Florida with a current status of operational. It is proposed to connect at Existing Crist 230kV Substation.

960.0 MWCapacity
OperationalStatus
SoutheastMarket
GasTechnology

Project facts

Canonical nameSoutheast Queue Project 369B — Gas in Escambia, Florida
Queue ID369B
Statusoperational
Source statusoperational
MarketSoutheast
TechnologyGas
Capacity960.0 MW
StateFlorida
CountyEscambia
Point of interconnectionExisting Crist 230kV Substation
Requested (queue) date2019-07-15
Proposed in-service date
Operational date2021-12-01
Withdrawn date
DeveloperFPL
Utility / transmission ownerFlorida Power & Light

What changed

No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-27

Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.