Southeast Queue Project 378B — Solar in Jackson, Florida
Southeast Queue Project 378B — Solar in Jackson, Florida is a 74.5 MW solar interconnection project in Jackson, Florida with a current status of operational. It is proposed to connect at Marianna - West Grand Ridge (PS) 115kV line.
74.5 MWCapacity
OperationalStatus
SoutheastMarket
SolarTechnology
Project facts
| Canonical name | Southeast Queue Project 378B — Solar in Jackson, Florida |
|---|---|
| Queue ID | 378B |
| Status | operational |
| Source status | operational |
| Market | Southeast |
| Technology | Solar |
| Capacity | 74.5 MW |
| State | Florida |
| County | Jackson |
| Point of interconnection | Marianna - West Grand Ridge (PS) 115kV line |
| Requested (queue) date | 2020-02-04 |
| Proposed in-service date | — |
| Operational date | 2023-01-31 |
| Withdrawn date | — |
| Developer | FPL |
| Utility / transmission owner | Florida Power & Light |
What changed
No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.
Explore related data
Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-27
Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Follow this project and get an alert when its status, capacity, developer, or schedule changes.
Start tracking with interXdata