Southeast Queue Project 380D — Solar in Calhoun, Florida is a 20.0 MW solar interconnection project in Calhoun, Florida with a current status of withdrawn. It is proposed to connect at Altha - Gaskin (PS) 115kV line.

20.0 MWCapacity
WithdrawnStatus
SoutheastMarket
SolarTechnology

Project facts

Canonical nameSoutheast Queue Project 380D — Solar in Calhoun, Florida
Queue ID380D
Statuswithdrawn
Source statuswithdrawn
MarketSoutheast
TechnologySolar
Capacity20.0 MW
StateFlorida
CountyCalhoun
Point of interconnectionAltha - Gaskin (PS) 115kV line
Requested (queue) date2020-02-27
Proposed in-service date2027-10-15
Operational date
Withdrawn date
DeveloperThird Party
Utility / transmission ownerFlorida Power & Light

What changed

No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-27

Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata