Southeast Queue Project 41456 — Battery in Mecklenburg, North Carolina

Southeast Queue Project 41456 — Battery in Mecklenburg, North Carolina is a 2.8 MW battery interconnection project in Mecklenburg, North Carolina with a current status of withdrawn. It is proposed to connect at Reames Rd Ret 2408.

2.8 MWCapacity
WithdrawnStatus
SoutheastMarket
BatteryTechnology

Project facts

Canonical nameSoutheast Queue Project 41456 — Battery in Mecklenburg, North Carolina
Queue ID41456
Statuswithdrawn
Source statuswithdrawn
MarketSoutheast
TechnologyBattery
Capacity2.8 MW
StateNorth Carolina
CountyMecklenburg
Point of interconnectionReames Rd Ret 2408
Requested (queue) date2019-08-05
Proposed in-service date
Operational date
Withdrawn date
Developer
Utility / transmission ownerDuke Energy Progress

What changed

No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-27

Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata