Southeast Queue Project 458A — Solar+Battery in Jackson, Florida

Southeast Queue Project 458A — Solar+Battery in Jackson, Florida is a 75.0 MW solar+battery interconnection project in Jackson, Florida with a current status of withdrawn. It is proposed to connect at Holmes Creek-Highlands City 230kV.

75.0 MWCapacity
WithdrawnStatus
SoutheastMarket
Solar+BatteryTechnology

Project facts

Canonical nameSoutheast Queue Project 458A — Solar+Battery in Jackson, Florida
Queue ID458A
Statuswithdrawn
Source statuswithdrawn
MarketSoutheast
TechnologySolar+Battery
Capacity75.0 MW
StateFlorida
CountyJackson
Point of interconnectionHolmes Creek-Highlands City 230kV
Requested (queue) date2022-04-11
Proposed in-service date2025-01-11
Operational date
Withdrawn date
DeveloperThird Party
Utility / transmission ownerFlorida Power & Light

What changed

No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-27

Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata