Southeast Queue Project 5 — Gas in Pasco, Florida
Southeast Queue Project 5 — Gas in Pasco, Florida is a 480.0 MW gas interconnection project in Pasco, Florida with a current status of operational. It is proposed to connect at Hudson Substation 230 kV.
480.0 MWCapacity
OperationalStatus
SoutheastMarket
GasTechnology
Project facts
| Canonical name | Southeast Queue Project 5 — Gas in Pasco, Florida |
|---|---|
| Queue ID | 5 |
| Status | operational |
| Source status | operational |
| Market | Southeast |
| Technology | Gas |
| Capacity | 480.0 MW |
| State | Florida |
| County | Pasco |
| Point of interconnection | Hudson Substation 230 kV |
| Requested (queue) date | 1999-10-28 |
| Proposed in-service date | — |
| Operational date | 2002-02-08 |
| Withdrawn date | — |
| Developer | Seminole Electric Cooperative, Inc. |
| Utility / transmission owner | Duke Energy Progress |
What changed
No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.
Explore related data
Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-27
Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Follow this project and get an alert when its status, capacity, developer, or schedule changes.
Start tracking with interXdata