Southeast Queue Project 5 — Gas in Pasco, Florida

Southeast Queue Project 5 — Gas in Pasco, Florida is a 480.0 MW gas interconnection project in Pasco, Florida with a current status of operational. It is proposed to connect at Hudson Substation 230 kV.

480.0 MWCapacity
OperationalStatus
SoutheastMarket
GasTechnology

Project facts

Canonical nameSoutheast Queue Project 5 — Gas in Pasco, Florida
Queue ID5
Statusoperational
Source statusoperational
MarketSoutheast
TechnologyGas
Capacity480.0 MW
StateFlorida
CountyPasco
Point of interconnectionHudson Substation 230 kV
Requested (queue) date1999-10-28
Proposed in-service date
Operational date2002-02-08
Withdrawn date
DeveloperSeminole Electric Cooperative, Inc.
Utility / transmission ownerDuke Energy Progress

What changed

No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-27

Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata