Southeast Queue Project 536 — Solar in Muhlenberg, Kentucky

Southeast Queue Project 536 — Solar in Muhlenberg, Kentucky is a 250.0 MW solar interconnection project in Muhlenberg, Kentucky with a current status of active. It is proposed to connect at Lost City, KY 161-kV Switching Station.

250.0 MWCapacity
ActiveStatus
SoutheastMarket
SolarTechnology

Project facts

Canonical nameSoutheast Queue Project 536 — Solar in Muhlenberg, Kentucky
Queue ID536
Statusactive
Source statusactive
MarketSoutheast
TechnologySolar
Capacity250.0 MW
StateKentucky
CountyMuhlenberg
Point of interconnectionLost City, KY 161-kV Switching Station
Requested (queue) date2023-03-28
Proposed in-service date2026-08-11
Operational date
Withdrawn date
Developer
Utility / transmission ownerTennessee Valley Authority

What changed

No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-28

Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata