Southeast Queue Project 590 — Hydro in Marion, Tennessee
Southeast Queue Project 590 — Hydro in Marion, Tennessee is a 7.0 MW hydro interconnection project in Marion, Tennessee with a current status of active. It is proposed to connect at Nickajack Dam.
7.0 MWCapacity
ActiveStatus
SoutheastMarket
HydroTechnology
Project facts
| Canonical name | Southeast Queue Project 590 — Hydro in Marion, Tennessee |
|---|---|
| Queue ID | 590 |
| Status | active |
| Source status | active |
| Market | Southeast |
| Technology | Hydro |
| Capacity | 7.0 MW |
| State | Tennessee |
| County | Marion |
| Point of interconnection | Nickajack Dam |
| Requested (queue) date | 2023-11-03 |
| Proposed in-service date | 2028-02-01 |
| Operational date | — |
| Withdrawn date | — |
| Developer | — |
| Utility / transmission owner | Tennessee Valley Authority |
What changed
No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.
Explore related data
Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-27
Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Follow this project and get an alert when its status, capacity, developer, or schedule changes.
Start tracking with interXdata