Southeast Queue Project 61 — Battery in an unlisted county, the U.S.

Southeast Queue Project 61 — Battery in an unlisted county, the U.S. is a 95.0 MW battery interconnection project with a current status of operational. It is proposed to connect at Interbay Substation, Hillsborough County.

95.0 MWCapacity
OperationalStatus
SoutheastMarket
BatteryTechnology

Project facts

Canonical nameSoutheast Queue Project 61 — Battery in an unlisted county, the U.S.
Queue ID61
Statusoperational
Source statusoperational
MarketSoutheast
TechnologyBattery
Capacity95.0 MW
State
County
Point of interconnectionInterbay Substation, Hillsborough County
Requested (queue) date2019-08-13
Proposed in-service date2021-12-31
Operational date2021-12-31
Withdrawn date
Developer
Utility / transmission ownerTampa Electric Company

What changed

No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-27

Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.