Southeast Queue Project 661 — Battery in Shelby, Tennessee

Southeast Queue Project 661 — Battery in Shelby, Tennessee is a 200.0 MW battery interconnection project in Shelby, Tennessee with a current status of active. It is proposed to connect at TVA's Allen ‚Äì Freeport 161kV TL.

200.0 MWCapacity
ActiveStatus
SoutheastMarket
BatteryTechnology

Project facts

Canonical nameSoutheast Queue Project 661 — Battery in Shelby, Tennessee
Queue ID661
Statusactive
Source statusactive
MarketSoutheast
TechnologyBattery
Capacity200.0 MW
StateTennessee
CountyShelby
Point of interconnectionTVA's Allen – Freeport 161kV TL
Requested (queue) date2024-10-01
Proposed in-service date2026-04-30
Operational date
Withdrawn date
Developer
Utility / transmission ownerTennessee Valley Authority

What changed

No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-27

Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.