Southeast Queue Project 73 — Other in Marion, Florida

Southeast Queue Project 73 — Other in Marion, Florida is a 3.0 MW other interconnection project in Marion, Florida with a current status of operational. It is proposed to connect at Maricamp Substation.

3.0 MWCapacity
OperationalStatus
SoutheastMarket
OtherTechnology

Project facts

Canonical nameSoutheast Queue Project 73 — Other in Marion, Florida
Queue ID73
Statusoperational
Source statusoperational
MarketSoutheast
TechnologyOther
Capacity3.0 MW
StateFlorida
CountyMarion
Point of interconnectionMaricamp Substation
Requested (queue) date2007-10-09
Proposed in-service date2008-08-15
Operational date2010-05-31
Withdrawn date
DeveloperG2 Landfill
Utility / transmission ownerDuke Energy Progress

What changed

No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-27

Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata