Southeast Queue Project 95 — Gas in Taylor, Florida
Southeast Queue Project 95 — Gas in Taylor, Florida is a 1,204.0 MW gas interconnection project in Taylor, Florida with a current status of withdrawn. It is proposed to connect at Perry Substation.
1,204.0 MWCapacity
WithdrawnStatus
SoutheastMarket
GasTechnology
Project facts
| Canonical name | Southeast Queue Project 95 — Gas in Taylor, Florida |
|---|---|
| Queue ID | 95 |
| Status | withdrawn |
| Source status | withdrawn |
| Market | Southeast |
| Technology | Gas |
| Capacity | 1,204.0 MW |
| State | Florida |
| County | Taylor |
| Point of interconnection | Perry Substation |
| Requested (queue) date | 2008-08-11 |
| Proposed in-service date | 2013-06-01 |
| Operational date | — |
| Withdrawn date | — |
| Developer | — |
| Utility / transmission owner | Duke Energy Progress |
What changed
No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.
Explore related data
Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-27
Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Follow this project and get an alert when its status, capacity, developer, or schedule changes.
Start tracking with interXdata