Southeast Queue Project IC-1255 — Gas in Bartow, Georgia
Southeast Queue Project IC-1255 — Gas in Bartow, Georgia is a 722.0 MW gas interconnection project in Bartow, Georgia with a current status of active. It is proposed to connect at Plant Bowen Substation 230 kV Bus.
722.0 MWCapacity
ActiveStatus
SoutheastMarket
GasTechnology
Project facts
| Canonical name | Southeast Queue Project IC-1255 — Gas in Bartow, Georgia |
|---|---|
| Queue ID | IC-1255 |
| Status | active |
| Source status | active |
| Market | Southeast |
| Technology | Gas |
| Capacity | 722.0 MW |
| State | Georgia |
| County | Bartow |
| Point of interconnection | Plant Bowen Substation 230 kV Bus |
| Requested (queue) date | 2024-03-18 |
| Proposed in-service date | 2028-09-01 |
| Operational date | — |
| Withdrawn date | — |
| Developer | — |
| Utility / transmission owner | Southern Company |
What changed
No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.
Explore related data
Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-27
Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Follow this project and get an alert when its status, capacity, developer, or schedule changes.
Start tracking with interXdata