Southeast Queue Project LGE-CS2025-004 — Solar+Battery in Lincoln, Kentucky

Southeast Queue Project LGE-CS2025-004 — Solar+Battery in Lincoln, Kentucky is a 200.0 MW solar+battery interconnection project in Lincoln, Kentucky with a current status of active. It is proposed to connect at West Garrard - Pineville 345 kV line.

200.0 MWCapacity
ActiveStatus
SoutheastMarket
Solar+BatteryTechnology

Project facts

Canonical nameSoutheast Queue Project LGE-CS2025-004 — Solar+Battery in Lincoln, Kentucky
Queue IDLGE-CS2025-004
Statusactive
Source statusactive
MarketSoutheast
TechnologySolar+Battery
Capacity200.0 MW
StateKentucky
CountyLincoln
Point of interconnectionWest Garrard - Pineville 345 kV line
Requested (queue) date2025-12-15
Proposed in-service date2029-12-31
Operational date
Withdrawn date
Developer
Utility / transmission ownerLouisville Gas & Electric and Kentucky Utilities Energy

What changed

No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-27

Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata