Southeast Queue Project LGE-CS2025-007 — Gas in Trimble, Kentucky

Southeast Queue Project LGE-CS2025-007 — Gas in Trimble, Kentucky is a 17.0 MW gas interconnection project in Trimble, Kentucky with a current status of active. It is proposed to connect at Trimble County Switching Station, 345 kV (Unit #7).

17.0 MWCapacity
ActiveStatus
SoutheastMarket
GasTechnology

Project facts

Canonical nameSoutheast Queue Project LGE-CS2025-007 — Gas in Trimble, Kentucky
Queue IDLGE-CS2025-007
Statusactive
Source statusactive
MarketSoutheast
TechnologyGas
Capacity17.0 MW
StateKentucky
CountyTrimble
Point of interconnectionTrimble County Switching Station, 345 kV (Unit #7)
Requested (queue) date2025-12-18
Proposed in-service date2026-10-01
Operational date
Withdrawn date
Developer
Utility / transmission ownerLouisville Gas & Electric and Kentucky Utilities Energy

What changed

No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-27

Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata