Southeast Queue Project LGE-GIS-2022-006 — Solar+Battery in Clarke, Indiana is a 1,000.0 MW solar+battery interconnection project in Clarke, Indiana with a current status of withdrawn. It is proposed to connect at Trimble Co to Ghent line 345 kV as primary POI and Trimble Co substation 345 kV bus as alternate POI.
Project facts
| Canonical name | Southeast Queue Project LGE-GIS-2022-006 — Solar+Battery in Clarke, Indiana |
|---|---|
| Queue ID | LGE-GIS-2022-006 |
| Status | withdrawn |
| Source status | withdrawn |
| Market | Southeast |
| Technology | Solar+Battery |
| Capacity | 1,000.0 MW |
| State | Indiana |
| County | Clarke |
| Point of interconnection | Trimble Co to Ghent line 345 kV as primary POI and Trimble Co substation 345 kV bus as alternate POI |
| Requested (queue) date | 2022-08-22 |
| Proposed in-service date | 2029-01-09 |
| Operational date | — |
| Withdrawn date | — |
| Developer | — |
| Utility / transmission owner | Louisville Gas & Electric and Kentucky Utilities Energy |
What changed
No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.
Explore related data
Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Follow this project and get an alert when its status, capacity, developer, or schedule changes.
Start tracking with interXdata