Southeast Queue Project LGE-GIS-2024-002 — Gas in Hopkins, Kentucky

Southeast Queue Project LGE-GIS-2024-002 — Gas in Hopkins, Kentucky is a 75.0 MW gas interconnection project in Hopkins, Kentucky with a current status of active. It is proposed to connect at 2MADSNV LP W to 2 EARLINGTN N 69 kV line.

75.0 MWCapacity
ActiveStatus
SoutheastMarket
GasTechnology

Project facts

Canonical nameSoutheast Queue Project LGE-GIS-2024-002 — Gas in Hopkins, Kentucky
Queue IDLGE-GIS-2024-002
Statusactive
Source statusactive
MarketSoutheast
TechnologyGas
Capacity75.0 MW
StateKentucky
CountyHopkins
Point of interconnection2MADSNV LP W to 2 EARLINGTN N 69 kV line
Requested (queue) date2024-02-14
Proposed in-service date2027-04-01
Operational date
Withdrawn date
Developer
Utility / transmission ownerLouisville Gas & Electric and Kentucky Utilities Energy

What changed

No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-27

Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.