Southeast Queue Project PP00033 — Hydro in Montgomery, North Carolina

Southeast Queue Project PP00033 — Hydro in Montgomery, North Carolina is a 6.3 MW hydro interconnection project in Montgomery, North Carolina with a current status of active. It is proposed to connect at Tillery Hydroelectric Plant Switchyard (T1590).

6.3 MWCapacity
ActiveStatus
SoutheastMarket
HydroTechnology

Project facts

Canonical nameSoutheast Queue Project PP00033 — Hydro in Montgomery, North Carolina
Queue IDPP00033
Statusactive
Source statusactive
MarketSoutheast
TechnologyHydro
Capacity6.3 MW
StateNorth Carolina
CountyMontgomery
Point of interconnectionTillery Hydroelectric Plant Switchyard (T1590)
Requested (queue) date2025-06-16
Proposed in-service date2026-06-05
Operational date
Withdrawn date
Developer
Utility / transmission ownerDuke Energy Progress

What changed

No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-27

Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata