Southern Bighorn Solar 2 (69762_BESS2)

Southern Bighorn Solar 2 is a 100.0 MW battery interconnection project in Clark, Nevada with a current status of active.

100.0 MWCapacity
ActiveStatus
NEVPMarket
BatteryTechnology

Project facts

Canonical nameSouthern Bighorn Solar 2
Queue ID69762_BESS2
Statusactive
Source status(L) Regulatory approvals pending. Not under construction
MarketNEVP
TechnologyBattery
Capacity100.0 MW
StateNevada
CountyClark
Point of interconnection
Requested (queue) date
Proposed in-service date2028-07-01
Operational date
Withdrawn date
Developer
Utility / transmission owner425LM 8ME LLC

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-02new_projectactivehigh

Explore related data

Source last checked2026-08-03
Data last materially changed2026-08-03
Page data generated2026-08-27

Provenance: U.S. EIA — Form EIA-860M generator inventory (operating + planned). Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata