SOUTHERN LIGHT SOLAR (1229)

SOUTHERN LIGHT SOLAR is a 60.9 MW solar interconnection project in Fresno, California with a current status of withdrawn. It is proposed to connect at Coalinga #2 - Coalinga #1 70 kV line Approx. 1.9 miles south of Coalinga #2 and 1 mile east of the project site.

60.9 MWCapacity
WithdrawnStatus
Market
SolarTechnology

Project facts

Canonical nameSOUTHERN LIGHT SOLAR
Queue ID1229
Statuswithdrawn
Source statusWITHDRAWN
Market
TechnologySolar
Capacity60.9 MW
StateCalifornia
CountyFresno
Point of interconnectionCoalinga #2 - Coalinga #1 70 kV line Approx. 1.9 miles south of Coalinga #2 and 1 mile east of the project site
Requested (queue) date2016-05-02
Proposed in-service date
Operational date
Withdrawn date2017-03-13
Developer
Utility / transmission ownerPGAE

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: California ISO — public interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata