Spain Energy Center (GI-190)

Spain Energy Center is a 141.0 MW solar+battery interconnection project in Brooks County, Georgia with a current status of active. It is proposed to connect at Spain 230 kV Substation.

141.0 MWCapacity
ActiveStatus
GAMarket
Solar+BatteryTechnology

Project facts

Canonical nameSpain Energy Center
Queue IDGI-190
Statusactive
Source statusFacilities Study
MarketGA
TechnologySolar+Battery
Capacity141.0 MW
StateGeorgia
CountyBrooks County
Point of interconnectionSpain 230 kV Substation
Requested (queue) date2024-01-09
Proposed in-service date2028-09-01
Operational date
Withdrawn date
Developer
Utility / transmission ownerGeorgia Transmission

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-04new_projectactivehigh

Explore related data

Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-27

Provenance: gtc-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata