Spanish Fork Community Solar (66413_10112)

Spanish Fork Community Solar is a 4.0 MW solar interconnection project in Utah, Utah with a current status of operational.

4.0 MWCapacity
OperationalStatus
PACEMarket
SolarTechnology

Project facts

Canonical nameSpanish Fork Community Solar
Queue ID66413_10112
Statusoperational
Source status(OP) Operating
MarketPACE
TechnologySolar
Capacity4.0 MW
StateUtah
CountyUtah
Point of interconnection—
Requested (queue) date—
Proposed in-service date—
Operational date2021-07-01
Withdrawn date—
Developer—
Utility / transmission ownerUtah Municipal Power Agency

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-02new_project—operationalhigh

Explore related data

Source last checked2026-10-02
Data last materially changed2026-10-02
Page data generated2026-10-12

Provenance: U.S. EIA — Form EIA-860M generator inventory (operating + planned). Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata