SPEED 345 (J2586)

SPEED 345 is a 200.0 MW battery interconnection project in Clark, Indiana with a current status of operational. It is proposed to connect at SPEED 345.

200.0 MWCapacity
OperationalStatus
Market
BatteryTechnology

Project facts

Canonical nameSPEED 345
Queue IDJ2586
Statusoperational
Source statusActive
Market
TechnologyBattery
Capacity200.0 MW
StateIndiana
CountyClark
Point of interconnectionSPEED 345
Requested (queue) date2022-09-15
Proposed in-service date2025-04-01
Operational date2025-04-01
Withdrawn date
Developer
Utility / transmission ownerDuke Energy Progress

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_projectoperationalhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: MISO — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata