SPI QUINCY (1282)

SPI QUINCY is a 24.0 MW other interconnection project in Plumas, California with a current status of withdrawn. It is proposed to connect at SPI 60 kV Tap of PG&E's Caribou Plumas Jct. 60 kV line near Pole 17/12.

24.0 MWCapacity
WithdrawnStatus
Market
OtherTechnology

Project facts

Canonical nameSPI QUINCY
Queue ID1282
Statuswithdrawn
Source statusWITHDRAWN
Market
TechnologyOther
Capacity24.0 MW
StateCalifornia
CountyPlumas
Point of interconnectionSPI 60 kV Tap of PG&E's Caribou Plumas Jct. 60 kV line near Pole 17/12
Requested (queue) date2016-05-02
Proposed in-service date
Operational date
Withdrawn date2017-02-21
Developer
Utility / transmission ownerPGAE

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: California ISO — public interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.