Spinner Energy Storage (27INR0083)

Spinner Energy Storage is a 125.6 MW other interconnection project in Bee, Texas with a current status of operational. It is proposed to connect at 8196 Poesta Substation 138kV.

125.6 MWCapacity
OperationalStatus
BeeMarket
OtherTechnology

Project facts

Canonical nameSpinner Energy Storage
Queue ID27INR0083
Statusoperational
Source statusSS Completed, FIS Completed, No IA
MarketBee
TechnologyOther
Capacity125.6 MW
StateTexas
CountyBee
Point of interconnection8196 Poesta Substation 138kV
Requested (queue) date2023-10-13
Proposed in-service date
Operational date2029-07-10
Withdrawn date
DeveloperGCI ENERGY
Utility / transmission ownerERCOT

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectoperationalhigh

Explore related data

Source last checked2026-08-01
Data last materially changed2026-08-01
Page data generated2026-08-27

Provenance: ERCOT — Generation Interconnection Status (GIS) report. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata