Spinning Spur Wind Two (13INR0048)

Spinning Spur Wind Two is a 161.0 MW wind interconnection project with a current status of operational. It is proposed to connect at AJ Swoop tie Alibates-Windmill.

161.0 MWCapacity
OperationalStatus
ERCOTMarket
WindTechnology

Project facts

Canonical nameSpinning Spur Wind Two
Queue ID13INR0048
Statusoperational
Source statusoperational
MarketERCOT
TechnologyWind
Capacity161.0 MW
State
County
Point of interconnectionAJ Swoop tie Alibates-Windmill
Requested (queue) date2012-01-09
Proposed in-service date2014-06-01
Operational date2014-06-19
Withdrawn date
DeveloperCielo Wind Power
Utility / transmission ownerERCOT

What changed

No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-27

Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.