Spinosa BESS (27INR0412)

Spinosa BESS is a 201.2 MW other interconnection project in Wichita, Texas with a current status of operational. It is proposed to connect at Tap 138 kV Wichita Falls Cogen (#1498) – Pleasant Valley Switch (#1450).

201.2 MWCapacity
OperationalStatus
WichitaMarket
OtherTechnology

Project facts

Canonical nameSpinosa BESS
Queue ID27INR0412
Statusoperational
Source statusSS Completed, FIS Started, No IA
MarketWichita
TechnologyOther
Capacity201.2 MW
StateTexas
CountyWichita
Point of interconnectionTap 138 kV Wichita Falls Cogen (#1498) – Pleasant Valley Switch (#1450)
Requested (queue) date2025-04-29
Proposed in-service date
Operational date2030-05-08
Withdrawn date
DeveloperSpinosa Energy Center, LLC
Utility / transmission ownerERCOT

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectoperationalhigh

Explore related data

Source last checked2026-08-01
Data last materially changed2026-08-01
Page data generated2026-08-28

Provenance: ERCOT — Generation Interconnection Status (GIS) report. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata