Spirit Mound (6092_2)

Spirit Mound is a 67.5 MW other interconnection project in Clay, South Dakota with a current status of operational.

67.5 MWCapacity
OperationalStatus
SWPPMarket
OtherTechnology

Project facts

Canonical nameSpirit Mound
Queue ID6092_2
Statusoperational
Source status(OP) Operating
MarketSWPP
TechnologyOther
Capacity67.5 MW
StateSouth Dakota
CountyClay
Point of interconnection
Requested (queue) date
Proposed in-service date
Operational date1978-06-01
Withdrawn date
Developer
Utility / transmission ownerBasin Electric

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-02new_projectoperationalhigh

Explore related data

Source last checked2026-08-03
Data last materially changed2026-08-03
Page data generated2026-08-28

Provenance: U.S. EIA — Form EIA-860M generator inventory (operating + planned). Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata