Split Rock - White (WAPA) 345.0kV (J3964)

Split Rock - White (WAPA) 345.0kV is a 490.0 MW solar interconnection project in Brookings, South Dakota with a current status of operational. It is proposed to connect at Split Rock - White (WAPA) 345.0kV.

490.0 MWCapacity
OperationalStatus
Market
SolarTechnology

Project facts

Canonical nameSplit Rock - White (WAPA) 345.0kV
Queue IDJ3964
Statusoperational
Source statusActive
Market
TechnologySolar
Capacity490.0 MW
StateSouth Dakota
CountyBrookings
Point of interconnectionSplit Rock - White (WAPA) 345.0kV
Requested (queue) date2025-04-07
Proposed in-service date2030-01-31
Operational date2030-01-31
Withdrawn date
Developer
Utility / transmission ownerNORTHERN STATES POWER COMPANY

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_projectoperationalhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: MISO — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata