Springboro 138 kV Substation is a 125.0 MW wind interconnection project in Carroll County,White County, Indiana with a current status of withdrawn. It is proposed to connect at Springboro 138 kV Substation.

125.0 MWCapacity
WithdrawnStatus
Market
WindTechnology

Project facts

Canonical nameSpringboro 138 kV Substation
Queue IDJ1017
Statuswithdrawn
Source statusWithdrawn
Market
TechnologyWind
Capacity125.0 MW
StateIndiana
CountyCarroll County,White County
Point of interconnectionSpringboro 138 kV Substation
Requested (queue) date2018-03-12
Proposed in-service date2021-09-01
Operational date2021-09-01
Withdrawn date2018-10-03
Developer
Utility / transmission ownerDuke Energy Progress

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: MISO — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata