Springboro - Lafayette 138 kV (J2060)

Springboro - Lafayette 138 kV is a 170.0 MW solar interconnection project in Tippecanoe, Indiana with a current status of withdrawn. It is proposed to connect at Springboro - Lafayette 138 kV.

170.0 MWCapacity
WithdrawnStatus
Market
SolarTechnology

Project facts

Canonical nameSpringboro - Lafayette 138 kV
Queue IDJ2060
Statuswithdrawn
Source statusWithdrawn
Market
TechnologySolar
Capacity170.0 MW
StateIndiana
CountyTippecanoe
Point of interconnectionSpringboro - Lafayette 138 kV
Requested (queue) date2021-08-16
Proposed in-service date2025-05-01
Operational date2025-05-01
Withdrawn date2025-12-18
Developer
Utility / transmission ownerDuke Energy Progress

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: MISO — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata