Springbrooke (C24-076)

Springbrooke is a 82.8 MW solar interconnection project in Genesee, New York with a current status of withdrawn. It is proposed to connect at Southeast Batavia-Golah Line 119.

82.8 MWCapacity
WithdrawnStatus
NYISOMarket
SolarTechnology

Project facts

Canonical nameSpringbrooke
Queue IDC24-076
Statuswithdrawn
Source statuswithdrawn
MarketNYISO
TechnologySolar
Capacity82.8 MW
StateNew York
CountyGenesee
Point of interconnectionSoutheast Batavia-Golah Line 119
Requested (queue) date2024-08-05
Proposed in-service date
Operational date
Withdrawn date
DeveloperSUNXI LLC
Utility / transmission ownerNM-NG

What changed

No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-27

Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata