Springdale 138kV (AH1-562 - moved to TC2)

Springdale 138kV is a 250.0 MW battery interconnection project in Allegheny, Pennsylvania with a current status of withdrawn.

250.0 MWCapacity
WithdrawnStatus
Market
BatteryTechnology

Project facts

Canonical nameSpringdale 138kV
Queue IDAH1-562 - moved to TC2
Statuswithdrawn
Source statusWithdrawn
Market
TechnologyBattery
Capacity250.0 MW
StatePennsylvania
CountyAllegheny
Point of interconnection
Requested (queue) date2021-09-10
Proposed in-service date2025-06-01
Operational date
Withdrawn date2025-06-30
Developer
Utility / transmission ownerAPS

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-28

Provenance: PJM — new-services interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.