Springwater Wind Farm is a 79.5 MW generation interconnection project with a current status of withdrawn. It is proposed to connect at Eelpot Rd.

79.5 MWCapacity
WithdrawnStatus
Market
GenerationTechnology

Project facts

Canonical nameSpringwater Wind Farm
Queue ID0120
Statuswithdrawn
Source status0
Market
TechnologyGeneration
Capacity79.5 MW
StateNew York
County
Point of interconnectionEelpot Rd
Requested (queue) date2002-05-20
Proposed in-service date
Operational date
Withdrawn date
DeveloperECOGEN, LLC
Utility / transmission ownerNYSEG

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: New York ISO — interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.