SR Bacon (GI-143)

SR Bacon is a 85.0 MW solar interconnection project in Bacon County, Georgia with a current status of active. It is proposed to connect at Offerman-Douglas 230 kV TL.

85.0 MWCapacity
ActiveStatus
GAMarket
SolarTechnology

Project facts

Canonical nameSR Bacon
Queue IDGI-143
Statusactive
Source statusFull NTP
MarketGA
TechnologySolar
Capacity85.0 MW
StateGeorgia
CountyBacon County
Point of interconnectionOfferman-Douglas 230 kV TL
Requested (queue) date2020-08-26
Proposed in-service date2026-07-01
Operational date
Withdrawn date
Developer
Utility / transmission ownerGeorgia Transmission

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-04new_projectactivehigh

Explore related data

Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-27

Provenance: gtc-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata