SR Dry Branch - Refile is a 172.0 MW solar interconnection project in Twiggs County, Georgia with a current status of suspended. It is proposed to connect at Bonaire Primary - South Macon 230 kV Line.
172.0 MWCapacity
SuspendedStatus
GAMarket
SolarTechnology
Project facts
| Canonical name | SR Dry Branch - Refile |
|---|---|
| Queue ID | GI-220 |
| Status | suspended |
| Source status | On Hold |
| Market | GA |
| Technology | Solar |
| Capacity | 172.0 MW |
| State | Georgia |
| County | Twiggs County |
| Point of interconnection | Bonaire Primary - South Macon 230 kV Line |
| Requested (queue) date | 2026-01-15 |
| Proposed in-service date | 2029-05-01 |
| Operational date | — |
| Withdrawn date | — |
| Developer | — |
| Utility / transmission owner | Georgia Transmission |
What changed
| Observed | Field | Old value | New value | Materiality |
|---|---|---|---|---|
| 2026-08-04 | new_project | — | suspended | high |
Explore related data
Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-27
Provenance: gtc-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Follow this project and get an alert when its status, capacity, developer, or schedule changes.
Start tracking with interXdata