SR Terrell County Solar is a 77.0 MW solar interconnection project in Terrell, Georgia with a current status of operational. It is proposed to connect at Thrill Hill 115 kV Substation.

77.0 MWCapacity
OperationalStatus
SoutheastMarket
SolarTechnology

Project facts

Canonical nameSR Terrell County Solar
Queue IDGI-101
Statusoperational
Source statusoperational
MarketSoutheast
TechnologySolar
Capacity77.0 MW
StateGeorgia
CountyTerrell
Point of interconnectionThrill Hill 115 kV Substation
Requested (queue) date2023-12-31
Proposed in-service date
Operational date
Withdrawn date
Developer
Utility / transmission ownerGeorgia Transmission

What changed

No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-27

Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata