SS50S (LG-22-9-4)

SS50S is a 50.0 MW solar interconnection project in El Paso, Texas with a current status of active. It is proposed to connect at Wicked 115 kV Substation.

50.0 MWCapacity
ActiveStatus
WestMarket
SolarTechnology

Project facts

Canonical nameSS50S
Queue IDLG-22-9-4
Statusactive
Source statusactive
MarketWest
TechnologySolar
Capacity50.0 MW
StateTexas
CountyEl Paso
Point of interconnectionWicked 115 kV Substation
Requested (queue) date2022-09-30
Proposed in-service date2025-10-31
Operational date
Withdrawn date
Developer
Utility / transmission ownerEl Paso Electric Company

What changed

No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-27

Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata