Stafford Hill BESS (25INR0768)

Stafford Hill BESS is a 9.9 MW other interconnection project in Colorado, Texas with a current status of active. It is proposed to connect at New DESR on the coordinates above tie at 12.47kV to: TSP Station Name: Stafford Hill TSP Station Code: STAFHI Load Name: LOAD1 Bus #: PTI Bus Number: 78520 Voltage (Transmission level kV): 138kV Node (load/load XFMR in NMMS), Tranformer: LD01.

9.9 MWCapacity
ActiveStatus
ColoradoMarket
OtherTechnology

Project facts

Canonical nameStafford Hill BESS
Queue ID25INR0768
Statusactive
Source status
MarketColorado
TechnologyOther
Capacity9.9 MW
StateTexas
CountyColorado
Point of interconnectionNew DESR on the coordinates above tie at 12.47kV to: TSP Station Name: Stafford Hill TSP Station Code: STAFHI Load Name: LOAD1 Bus #: PTI Bus Number: 78520 Voltage (Transmission level kV): 138kV Node (load/load XFMR in NMMS), Tranformer: LD01
Requested (queue) date
Proposed in-service date2026-11-14
Operational date
Withdrawn date
DeveloperColorado Clean Energy Center, LLC
Utility / transmission ownerERCOT

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectactivehigh

Explore related data

Source last checked2026-08-01
Data last materially changed2026-08-01
Page data generated2026-08-27

Provenance: ERCOT — Generation Interconnection Status (GIS) report. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata