Stafford Street substation - NG Western MA Area Cluster Study (862)

Stafford Street substation - NG Western MA Area Cluster Study is a 20.4 MW solar interconnection project in Worcester, Massachusetts with a current status of withdrawn. It is proposed to connect at NG Stafford Street substation.

20.4 MWCapacity
WithdrawnStatus
WMAMarket
SolarTechnology

Project facts

Canonical nameStafford Street substation - NG Western MA Area Cluster Study
Queue ID862
Statuswithdrawn
Source statusW
MarketWMA
TechnologySolar
Capacity20.4 MW
StateMassachusetts
CountyWorcester
Point of interconnectionNG Stafford Street substation
Requested (queue) date2019-03-21
Proposed in-service date2022-10-01
Operational date
Withdrawn date2021-10-20
Developer
Utility / transmission ownerISO-NE

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-04new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-28

Provenance: isone-irtt. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata