Stanton 230 kV Substation (J1187)

Stanton 230 kV Substation is a 151.8 MW wind interconnection project in Mercer County, North Dakota with a current status of withdrawn. It is proposed to connect at Stanton 230 kV Substation.

151.8 MWCapacity
WithdrawnStatus
Market
WindTechnology

Project facts

Canonical nameStanton 230 kV Substation
Queue IDJ1187
Statuswithdrawn
Source statusWithdrawn
Market
TechnologyWind
Capacity151.8 MW
StateNorth Dakota
CountyMercer County
Point of interconnectionStanton 230 kV Substation
Requested (queue) date2018-03-12
Proposed in-service date2022-05-01
Operational date2022-05-01
Withdrawn date2021-03-09
Developer
Utility / transmission ownerGREAT RIVER ENERGY

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: MISO — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata