Starlight Storage 2 (30INR0163)
Starlight Storage 2 is a 104.3 MW battery interconnection project in Mills, Texas with a current status of withdrawn.
104.3 MWCapacity
WithdrawnStatus
MillsMarket
BatteryTechnology
Project facts
| Canonical name | Starlight Storage 2 |
|---|---|
| Queue ID | 30INR0163 |
| Status | withdrawn |
| Source status | — |
| Market | Mills |
| Technology | Battery |
| Capacity | 104.3 MW |
| State | Texas |
| County | Mills |
| Point of interconnection | — |
| Requested (queue) date | — |
| Proposed in-service date | — |
| Operational date | — |
| Withdrawn date | 2026-09-25 |
| Developer | — |
| Utility / transmission owner | ERCOT |
What changed
| Observed | Field | Old value | New value | Materiality |
|---|---|---|---|---|
| 2026-10-30 | new_project | — | withdrawn | high |
Explore related data
Source last checked2026-10-30
Data last materially changed2026-10-30
Page data generated2026-11-28
Provenance: ERCOT — Generation Interconnection Status (GIS) report. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Follow this project and get an alert when its status, capacity, developer, or schedule changes.
Start tracking with interXdata