Starling Solar (24INR0440)
Starling Solar is a 140.6 MW solar interconnection project in Gonzales, Texas with a current status of operational. It is proposed to connect at 138-kV Birdhouse (7255) Starling Solar Phase II is a an addition of 42.24MW to the 23INR0035 (solar) filed in 2020. 23INR0181 (storage) was filed in 2021. .
Project facts
| Canonical name | Starling Solar |
|---|---|
| Queue ID | 24INR0440 |
| Status | operational |
| Source status | SS Completed, FIS Started, IA |
| Market | Gonzales |
| Technology | Solar |
| Capacity | 140.6 MW |
| State | Texas |
| County | Gonzales |
| Point of interconnection | 138-kV Birdhouse (7255) Starling Solar Phase II is a an addition of 42.24MW to the 23INR0035 (solar) filed in 2020. 23INR0181 (storage) was filed in 2021. |
| Requested (queue) date | 2022-10-06 |
| Proposed in-service date | — |
| Operational date | 2028-01-28 |
| Withdrawn date | — |
| Developer | Starling Solar, LLC |
| Utility / transmission owner | ERCOT |
Cross-source records
This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.
What changed
| Observed | Field | Old value | New value | Materiality |
|---|---|---|---|---|
| 2026-07-31 | new_project | — | operational | high |
Explore related data
Provenance: ERCOT — Generation Interconnection Status (GIS) report. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Follow this project and get an alert when its status, capacity, developer, or schedule changes.
Start tracking with interXdata