Starling Storage (23INR0181)
Starling Storage is a 63.6 MW battery interconnection project in Gonzales, Texas with a current status of withdrawn.
63.6 MWCapacity
WithdrawnStatus
GonzalesMarket
BatteryTechnology
Project facts
| Canonical name | Starling Storage |
|---|---|
| Queue ID | 23INR0181 |
| Status | withdrawn |
| Source status | — |
| Market | Gonzales |
| Technology | Battery |
| Capacity | 63.6 MW |
| State | Texas |
| County | Gonzales |
| Point of interconnection | — |
| Requested (queue) date | — |
| Proposed in-service date | — |
| Operational date | — |
| Withdrawn date | 2026-09-25 |
| Developer | — |
| Utility / transmission owner | ERCOT |
Cross-source records
This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.
What changed
| Observed | Field | Old value | New value | Materiality |
|---|---|---|---|---|
| 2026-10-30 | developer | Starling Storage, LLC | — | low |
| 2026-10-30 | poi_name | tap 138kV 7224 Luling - 7245 Gonzales | — | low |
| 2026-10-30 | phase | SS Completed, FIS Completed, IA | — | low |
| 2026-10-30 | ia_signed_date | 2023-08-03 | — | medium |
| 2026-10-30 | operational_date | 2027-05-15 | — | medium |
| 2026-10-30 | withdrawn_date | — | 2026-09-25 | high |
| 2026-10-30 | status | operational | withdrawn | high |
| 2026-07-31 | new_project | — | operational | high |
Explore related data
Source last checked2026-10-30
Data last materially changed2026-10-30
Page data generated2026-11-26
Provenance: ERCOT — Generation Interconnection Status (GIS) report. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Follow this project and get an alert when its status, capacity, developer, or schedule changes.
Start tracking with interXdata