Steel River Solar Phase 2 (70398_SRSP2)

Steel River Solar Phase 2 is a 500.0 MW solar interconnection project in Mississippi, Arkansas with a current status of active.

500.0 MWCapacity
ActiveStatus
MISOMarket
SolarTechnology

Project facts

Canonical nameSteel River Solar Phase 2
Queue ID70398_SRSP2
Statusactive
Source status(U) Under construction, less than or equal to 50 percent complete
MarketMISO
TechnologySolar
Capacity500.0 MW
StateArkansas
CountyMississippi
Point of interconnection—
Requested (queue) date—
Proposed in-service date2029-07-01
Operational date—
Withdrawn date—
Developer—
Utility / transmission ownerCypress Creek Renewables

What changed

ObservedFieldOld valueNew valueMateriality
2026-09-02new_project—activehigh

Explore related data

Source last checked2026-10-02
Data last materially changed2026-10-02
Page data generated2026-10-11

Provenance: U.S. EIA — Form EIA-860M generator inventory (operating + planned). Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata