Steel River Solar Phase 3 (70399_SRSB3)

Steel River Solar Phase 3 is a 250.0 MW battery interconnection project in Mississippi, Arkansas with a current status of active.

250.0 MWCapacity
ActiveStatus
MISOMarket
BatteryTechnology

Project facts

Canonical nameSteel River Solar Phase 3
Queue ID70399_SRSB3
Statusactive
Source status(U) Under construction, less than or equal to 50 percent complete
MarketMISO
TechnologyBattery
Capacity250.0 MW
StateArkansas
CountyMississippi
Point of interconnection—
Requested (queue) date—
Proposed in-service date2030-07-01
Operational date—
Withdrawn date—
Developer—
Utility / transmission ownerCypress Creek Renewables

What changed

ObservedFieldOld valueNew valueMateriality
2026-09-02new_project—activehigh

Explore related data

Source last checked2026-10-02
Data last materially changed2026-10-02
Page data generated2026-10-12

Provenance: U.S. EIA — Form EIA-860M generator inventory (operating + planned). Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata