Steel River Solar Phase 3 is a 250.0 MW battery interconnection project in Mississippi, Arkansas with a current status of active.
250.0 MWCapacity
ActiveStatus
MISOMarket
BatteryTechnology
Project facts
| Canonical name | Steel River Solar Phase 3 |
|---|---|
| Queue ID | 70399_SRSB3 |
| Status | active |
| Source status | (U) Under construction, less than or equal to 50 percent complete |
| Market | MISO |
| Technology | Battery |
| Capacity | 250.0 MW |
| State | Arkansas |
| County | Mississippi |
| Point of interconnection | — |
| Requested (queue) date | — |
| Proposed in-service date | 2030-07-01 |
| Operational date | — |
| Withdrawn date | — |
| Developer | — |
| Utility / transmission owner | Cypress Creek Renewables |
What changed
| Observed | Field | Old value | New value | Materiality |
|---|---|---|---|---|
| 2026-09-02 | new_project | — | active | high |
Explore related data
Source last checked2026-10-02
Data last materially changed2026-10-02
Page data generated2026-10-12
Provenance: U.S. EIA — Form EIA-860M generator inventory (operating + planned). Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Follow this project and get an alert when its status, capacity, developer, or schedule changes.
Start tracking with interXdata