Stellar Wright BESS (69925_SWBA1)
Stellar Wright BESS is a 84.8 MW battery interconnection project in Merced, California with a current status of active.
84.8 MWCapacity
ActiveStatus
CISOMarket
BatteryTechnology
Project facts
| Canonical name | Stellar Wright BESS |
|---|---|
| Queue ID | 69925_SWBA1 |
| Status | active |
| Source status | (U) Under construction, less than or equal to 50 percent complete |
| Market | CISO |
| Technology | Battery |
| Capacity | 84.8 MW |
| State | California |
| County | Merced |
| Point of interconnection | — |
| Requested (queue) date | — |
| Proposed in-service date | 2026-10-01 |
| Operational date | — |
| Withdrawn date | — |
| Developer | — |
| Utility / transmission owner | Stellar Renewable Power |
What changed
| Observed | Field | Old value | New value | Materiality |
|---|---|---|---|---|
| 2026-08-02 | new_project | — | active | high |
Explore related data
Source last checked2026-08-03
Data last materially changed2026-08-03
Page data generated2026-08-27
Provenance: U.S. EIA — Form EIA-860M generator inventory (operating + planned). Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Follow this project and get an alert when its status, capacity, developer, or schedule changes.
Start tracking with interXdata