Stillhouse Solar (65894_OCISS)

Stillhouse Solar is a 210.0 MW solar interconnection project in Bell, Texas with a current status of operational.

210.0 MWCapacity
OperationalStatus
ERCOMarket
SolarTechnology

Project facts

Canonical nameStillhouse Solar
Queue ID65894_OCISS
Statusoperational
Source status(OP) Operating
MarketERCO
TechnologySolar
Capacity210.0 MW
StateTexas
CountyBell
Point of interconnection—
Requested (queue) date—
Proposed in-service date—
Operational date2025-11-01
Withdrawn date—
Developer—
Utility / transmission ownerStillhouse Solar LLC

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-02new_project—operationalhigh

Explore related data

Source last checked2026-10-02
Data last materially changed2026-10-02
Page data generated2026-10-12

Provenance: U.S. EIA — Form EIA-860M generator inventory (operating + planned). Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata